2012年项目管理认证练习题(中英文)11
编者按:常梦网项目管理师考试频道为参加2012年项目管理考试的考生朋友搜集整理2012年项目管理认证练习题(中英文),供大家参考复习!在此祝愿大家考试成功!
1. A door panel for a new car is inspected prior to installation on the automobile. This is an example of:
Prevention
Variable Sampling
Quality Assurance
Quality Control
新汽车的仪表盘在安装前已经被检验. 这是下列那一种的例子:
预防
可变样本
质量保证
质量控制
2. A thunderstorm caused intermittent power outages during a 24-hour period. When the day’s production run was sampled it was found that over 50% of the products produced were defective. These defects are an example of :
Variable sampling
Special causes
Prevention
Inspection
Random causes
一场雷暴造成24小时的停电. 白天生产的产品被发现有50%的不合格. 此种不合格是下列那一个的例子:
可变样本
特殊原因
预防性
检查
随即原因
3. A:PM wanted to show management ,visually, how quality controls were affecting processes. the best tool to accomplish this is :
diagrams
Histograms
Flowcharts
Control charts
Statistical samples
项目经理想向管理层显示可视的质量控制对过程的影响. 完成它最好的工具是:
Pareto 图
柱状图
流程图
控制图
统计样本
4. A PM is developing the projects budget and wants to have adequate resources to implement a solid quality control program. His project will cost approximately $110.00.What is the minimum amount he should include in the project budget for the quality program?
$10,000
$7,500
$6,135
$3,300
$5,500
一个项目经理正项目预算同时想使用适当的资源完成稳固的质量控制程序. 它的项目成本大约是$110.00,他应当在项目预算中对质量的预算最少做多少?
$10,000
$7,500
$6,135
$3,300
$5,500
5. Repeating the initiating processes at the beginning of each phase to keep the project focused on:
Interaction between phases.
The details of the project using rolling wave planning
Process group overlapping within each phase.
Business needs.
在每一阶段初期重复立项过程以保证项目着重于:
阶段间的交互
项目运用滚动波浪计划的细节
在每一阶段工艺组有重叠
商业需要
编者按:常梦网项目管理师考试频道为参加2012年项目管理考试的考生朋友搜集整理2012年项目管理认证练习题(中英文),供大家参考复习!在此祝愿大家考试成功!
1. The project plan is a document designed to tell__________ exactly what should be happening in a given
period of time.
Anyone associated with the project
The project manager
The functional manager
The client
项目计划是设计用于向____确切描述在给定时段将发生情况的文件.
任何与项目有关的人
项目经理
职能经理
客户
2. In which process group do we identify human and non-human resources required for a project?
Initiating
Executing
Planning
Controlling
Closing
在哪一个过程组中我们可确定项目所需的人力和非人力资源?
立项
实施
计划
控制
收尾
3. Feasibility studies are performed in the ______ process group of the project.
Initiating
Executing
Planning
Controlling
可行性研究在项目的____过程组实施?
立项
实施
计划
控制
4. In which process group do we examine alternative ways of accomplishing project objecties?
Initiating
Executing
Closing
Planning
Controlling
我们在哪一个过程组调查实现项目目标的不同途径?
立项
实施
收尾
计划
控制
5. In which process group do we transfer resources to other systems?
Initiating
Executing
Controlling
Planning
Closing
在哪一个过程组我们将资源转移到其他系统?
立项
实施
控制
计划
收尾
6. In the integration management process, the project development uses the outputs of the other planning processes to create a consistent, coherent document that can be used to guide both project______
Execution, control
Control, termination
Scope management, integration
Initiation and close-out.
在综合管理程序中,项目开展使用其他计划过程的输出以形成一个持续的,连贯的文件以便用于同时指导项目的___.
实施,控制
控制, 终止
范围管理,综合
立项,收尾
7. Of the PMBOKTM’s five project management process groups, which group is a common thread that spans the majority of these processes from the start to finish?
Executing
Planning
Controlling
Initiating
Closing
PMBOKTM’s的五个项目管理过程组中,哪一个过程组由始至终作为共同的线索跨越了绝大多数的过程?
实施
计划
控制
立项
收尾
8. Of the PMBOKTM’s five project management process groups, which group has the highest level of activity throughout the life of the project?
a. Executing
Planning
Controlling
d. Initiating
PMBOKTM’s的五个项目管理过程组中,哪一个过程组在项目整个寿命周期内拥有工序的最高级别?
a. 实施
b. 计划
c. 控制
d. 立项
9. The integrated project plan provides the baseline of:
The risk identification process
Any corrective action to be taken
Which changes will be controlled
Any work performance system.
综合项目计划提供了___基线?
风险辨别程序
任何实施的纠正措施
将被控制的变化
任何工作执行系统
10. Which of the following functions does NOT pertain to the roles and responsibilities of the project manager?
Planning
Staffing
Controlling
Directing
以下功能中哪一项不属于项目经理的角色和职责?
计划
人员招募
控制
指导
推荐阅读:
2012年PMP考试全真模拟试题及答案精选
2012年项目管理考试练习题及答案
编者按:常梦网项目管理师考试频道为参加2012年项目管理考试的考生朋友搜集整理2012年项目管理认证练习题(中英文),供大家参考复习!在此祝愿大家考试成功!
1. To ensure the project team provides the functionality the customer expects in a new piece of software, the PM asks the customer for sign-off on the design criteria. These documents are:
Technical specifications
Performance specifications
Product descriptions
Quality assurance
为保证项目组提供的客户期望的新软件的功能性,项目经理要求客户在设计标准上签名以结束. 这些文件是:
技术规格
执行规格
产品描述
质量保证
2. The individual employee performing a task:
a. Has the ultimate responsibility for the conformance of results to the requirements or specifications.
b. Is part of grand program design, the true nature of which is known only to the project manager.
c. Cannot contribute significantly to overall project quality.
d. Should not care about task quality because his/her contribution is insignificant compared to the overall scope of the project.
个别员工执行任务
对执行结果是否符合要求和规格付有最终责任.
是主要的程序设计的一部分,其真实本性只有项目经理知道.
对全部项目质量不可能有突出的贡献
应该不关心质量因为他/她对全部的项目范围无关紧要
3. Statistical process control consists of the application for:
Formal statistical sampling and control procedures that allow for the very accurate monitoring of a process by which a task is performed, thereby ensuring that the product will be in conformance with specifications.
The use of formal statistical concepts and techniques to decide on alternative choices, particularly during the execution and finishing phases of project.
The collection of data from less than 100 percent of the elements in a population, from which inferences can be made and actions taken.
Representing the subjective consideration for accepting the sampled product.
统计过程控制的一致性应用在:
正式的统计样本和控制程序中,他允许非常精确地测量执行任务的过程,因此保证产品同规格的一致性. .
使用正式的统计概念和技术上以决定做出的选择,特别是在项目的执行和结束阶段.
从低于100%的总体因素中收集数据,由此推断出可制造的产品和可从事的活动.
表达对可接受产品需要的考虑目标
4. When the individual is given the training, tools, and techniques to perform the function to produce a quality product, a sense of personal pride and commitment is developed. This concept is called:
Partnership
Ownership
Quality administration
Commitment to conformance
当个人得到培训,工具和技术去执行制造一个质量产品时,个人的自尊和承诺的官能得到发展. 此概念叫:
合伙
所有权
质量管理
义务的一滦?/P>
5. The development of a comprehensive program that includes the processes of identifying objectives and strategies of client interfacing; of organizing and coordinating planned and systematic controls for maintaining established standards; measuring and evaluating performance against these standards; reporting results; and taking appropriate action is known as the:
Quality management function
Overall quality philosophy
Quality evaluation methods
Managerial quality assurance
一个全面程序的发展包括识别目标的过程和面对客户的策略,组织和协调有计划的和系统的控制以保持建立的标准;测量和评估执行标准的情况;报告结果和采取适当的行动. 它就是:
质量管理功能
全面质量思想
质量评估方法
可管理的质量保证